Tuesday, September 28, 2010

Spring has sprung!

At last we have some fine weather. I suspect even the ducks were getting sick of the rain. I have yet to get out and about and take some farm pictures but in the meantime here are some pictures that I took of Chris putting up the lights in the shed.

Since it rained all last weekend it was a perfect opportunity to do some tidying up of the shed and getting it ready for the next stage (lights, power and lining).


The shed looking a little less cluttered after we had a clear out
Lights on boards attached to roof
Lights ready for wiring

Chris' ladder contraption
Yes you saw right... definitely NOT OSH approved!

Wednesday, September 22, 2010

The finished cottage

I have been a very bad blogger. Truth be told, not much has been happening lately as 1. we have limited internet here as there is no ADSL and we have to have moblie broadband, 2. the construction supervisor (that's Chris) went to Poland for his brother's wedding for 12 days and 3. the weather has been absolute rubbish with heavy rain and strong winds for nearly a week and a half so any thoughts of outdoor activity has be firmly quashed.

Chris has managed to use his inside time constructively and has taken some lovely shots of the cottage with all our furniture in it.

A bit of photoshop and we magically have grass

Lounge/dining

looking from dining room through lounge to french doors

Looking back from lounge to kitchen

Dining looking into kitchen

Our lovely kitchen


Bathroom

Bathroom/laundry

Master bedroom

Master bedroom again