Wednesday, September 22, 2010

The finished cottage

I have been a very bad blogger. Truth be told, not much has been happening lately as 1. we have limited internet here as there is no ADSL and we have to have moblie broadband, 2. the construction supervisor (that's Chris) went to Poland for his brother's wedding for 12 days and 3. the weather has been absolute rubbish with heavy rain and strong winds for nearly a week and a half so any thoughts of outdoor activity has be firmly quashed.

Chris has managed to use his inside time constructively and has taken some lovely shots of the cottage with all our furniture in it.

A bit of photoshop and we magically have grass

Lounge/dining

looking from dining room through lounge to french doors

Looking back from lounge to kitchen

Dining looking into kitchen

Our lovely kitchen


Bathroom

Bathroom/laundry

Master bedroom

Master bedroom again

2 comments: