Chris has been making the most of the long weekend to work on the tackroom and the stables/tie up area. He finished lining the tack room and partition walls. We are going to oil or varnish it to protect the plywood from damp horse gear before we attach the various racks, hooks and shelves to the walls. It will be a fantastic space to store all my tack and feed.
| In feed room looking into tack room |
| Standing at door to stables looking back at rest of shed |
| Tack room |
| In tack room looking through doorway to feed room |
| Standing at doorway into rest of shed looking at feed room and door to stables |
| Stable doors |
The concrete that was poured on Friday is dry enough to walk on, so Chris installed the rails around the washbay. It is looking very smart indeed.
| First rail up |
| The man at work |
| Check out that workmanship |
| The finished product |
| All done |
| Retractable hose |
| Hosing the concrete looking rather chuffed! |
| Hosing concrete around drain |
| Inset drain |
| Waste water drain to soak hole |
| Hosing concrete |
| View from outside |
WOW...that looks awesome!
ReplyDeleteGee Annika, that is looking a bit flash!!!
ReplyDelete