Chris' project for the past couple of weekends has been building a mezzanine floor inside the shed. It is primarily for extra storage space, and a good way of utilising the extra height in the roof. He finished it today, had a big tidy up and even managed to make room for the float.
| Constructing the frame |
| Apparently these are not gallows |
| Frame nearly complete |
| Last joist |
| Plywood for the floor |
| Up she goes |
| 1st floor panel |
| Heaps of space |
| View from above |
| Heaps of storage |
| Lots of space |
| Telephone |
| Chris' never-ending job list |
| Here comes the float |
| In it goes |
| Nearly there |
| Perfect fit |
| Muffin and Oscar sharing a moment |
No comments:
Post a Comment